News Latest

New Recipe

Asian Games boxing selection twist: Sumit Kundu returns after Ministry intervention, Deepak Punia back in reserve | Boxing News

NEW DELHI: In yet another bizarre twist to India’s Asian Games boxing selection, Sumit Kundu has retained his place in the men’s 70kg squad despite losing a fresh trial to Deepak Punia, who has now been relegated to reserve.The sports ministry’s final Indian contingent list has named Kundu in the 11-member boxing team — six...

RVUNL JE recruitment 2026 registration deadline extended till August 31: Check direct link to apply here

RVUNL JE recruitment 2026 The Rajasthan power companies have extended the deadline to apply for their 2026 recruitment drive, giving candidates more time to submit their applications. The new last date is August 31, 2026.The recruitment drive covers 2,005 posts across two common recruitment exercises. One notification is for Junior Accountant and Junior Assistant/Commercial Assistant-II...

Yash’s ‘Toxic: A Fairy Tale for Grown-Ups’ makers urge fans not to record or leak scenes ahead of release: ‘Don’t give away spoilers and ruin it for others’ |

Yash’s ‘Toxic: A Fairy Tale for Grown-Ups’ makers urge fans not to record or leak scenes ahead of release: ‘Don’t give away spoilers and ruin it for others’ Just hours ahead of the release of Yash’s much-awaited pan-India film ‘Toxic: A Fairy Tale for Grown-Ups’, the makers have issued a heartfelt appeal to audiences, requesting...

‘A whole new vibe’: Ashwini Vaishnaw shares glimpse of bullet train project taking shape

Table of Content

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

The Future of Gadgets

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been standard dummy text ever since the 1500s,

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.


'A whole new vibe': Ashwini Vaishnaw shares glimpse of bullet train project taking shape
Ashwini Vaishnaw shares glimpse of bullet train project taking shape

India’s first bullet train is slowly moving from plans to pillars. Railway minister Ashwini Vaishnaw on Tuesday shared a glimpse of the work taking shape across Thane and Palghar, calling it, “a whole new vibe!” The 135.45-km elevated section stretches from Shilphata in Thane district to Zaroli village on the Maharashtra-Gujarat border.The route cuts through varied terrain, with 124.027 km of the section comprising viaducts and bridges, the National High Speed Rail Corporation Limited (NHSRCL) said in an official release on Tuesday.The construction is at different stages along the stretch. Pier work is underway across more than 100 km, while nearly 74 km of piers have been completed and are ready for viaduct girders.The work is being supported by nine casting yards, seven full-span launching gantries and eight SBS launching gantries, all currently operational in Maharashtra.Three elevated stations are also coming up along the stretch: Thane, Virar and Boisar. The Thane station has a concourse level around 12 metres above the natural ground level, a design aimed at protecting and preserving local mangroves in the eco-sensitive zone.The tunnels are making progress too. Of the seven planned mountain tunnels on the section, three have already achieved breakthrough, with drainage, waterproofing and lining work now underway.Bridges are another key part of the stretch, including a 460-metre bridge over the Ulhas River, a 2.32-km bridge over the Vaitarna River and a 510-metre bridge over the Jagani River.Overall, the section will have 36 bridges and crossings, including 12 steel bridges over major railway lines, the Mumbai-Nashik Highway and the Ulhas River.The release said the progress reflects the engineering work behind the project under Prime Minister Narendra Modi’s vision and Railway minister Ashwini Vaishnaw’s drive to expand next-generation railway infrastructure.



Source link

todaynewss.in

Leave a Reply

Your email address will not be published. Required fields are marked *

Trending

Popular

Top News

Latest News

Hot News

©2026 .Today Newss  All rights reserved.